The Basic Principles Of wall ties
NCMA and the businesses disseminating this specialized information disclaim any and all accountability and liability for that accuracy and the applying of the knowledge contained in this publication.-Drill pilot gap through the façade material and in to the backup materials to the specified embedment depth + 1" utilizing proper drill bit(s) inside